Amaze Project 501 update
Beta timeline with sporadic HV YXRs is secured (GBNF+, n=2), with hyperphasic grid activated. Internal YXR flow recovery is in progress.
HVBN intersection (PHI 3.2, P 0.90, THETA 0.83, VTXPOS 2.0) is unstable and requires GBNF security patch application, time calibrated with integration curve and triangulated with other YXRs / HVBNs.
LJVTX protocols in execution, LOC security patch required.
0 Response to "Amaze Project 501 update "
Post a Comment