Amaze Project 501 Update

PLOC has been confirmed, leading to DGRID exposure.

LSIP is not yet supported due to unfavorable grid ratio.

Minimum SDBN requirements are set at PHI 2.5-3.5, P>0.8, THETA>0.9, VTXPOS>2.0.

Minimum hyperphase streaming requirements are set at
beta (numex stream): PHI 1.5-3.5, P>0.9 THETA >0.60, VTXPOS >1.8
mu (cts/dl stream): PHI 2.5-3.5, P>0.8, THETA >0.93, VTXPOS >1.8
omega (compromised stream): PHI 1.5-4.0, P>0.8, THETA >0.80, VTXPOS >1.8

Beta stream is LSIP/Wonderland positive.
Factor correlation between SDBN and mu stream is +0.85.
Omega stream is still permitted due to unfavorable grid ratio.

All other sequences are defined in MASTERPIECE v2.2 and remain confidential.

Evaluate at ECL2.

0 Response to "Amaze Project 501 Update"

Post a Comment

Iklan Atas Artikel

Iklan Tengah Artikel 1

Iklan Tengah Artikel 2

Iklan Bawah Artikel