Amaze Project 501 Update
PLOC has been confirmed, leading to DGRID exposure.
LSIP is not yet supported due to unfavorable grid ratio.
Minimum SDBN requirements are set at PHI 2.5-3.5, P>0.8, THETA>0.9, VTXPOS>2.0.
Minimum hyperphase streaming requirements are set at
beta (numex stream): PHI 1.5-3.5, P>0.9 THETA >0.60, VTXPOS >1.8
mu (cts/dl stream): PHI 2.5-3.5, P>0.8, THETA >0.93, VTXPOS >1.8
omega (compromised stream): PHI 1.5-4.0, P>0.8, THETA >0.80, VTXPOS >1.8
Beta stream is LSIP/Wonderland positive.
Factor correlation between SDBN and mu stream is +0.85.
Omega stream is still permitted due to unfavorable grid ratio.
All other sequences are defined in MASTERPIECE v2.2 and remain confidential.
Evaluate at ECL2.
0 Response to "Amaze Project 501 Update"
Post a Comment